Loading
  • All
  • 0 - 9
  • A
  • B
  • C
  • D
  • E
  • F
  • G
  • H
  • I
  • J
  • K
  • L
  • M
  • N
  • O
  • P
  • Q
  • R
  • S
  • T
  • U
  • V
  • W
  • X
  • Y
  • Z
You're currently filtering by:
La Central’s Two-Building, 420-Unit Second Phase Takes Shape in Melrose, The Bronx
Construction is progressing on 625 and 671 Brook Avenue, the final two residential buildings in the La Central complex in Melrose, The Bronx. Designed by MHG Architects and FXCollaborative, the 13- an …
Landmarked Office Building, the Refinery at Domino, Opens on the Williamsburg Waterfront
The iconic Domino Sugar Factory has reopened as a 15-story, 460,000-square-foot Class A office space on the Brooklyn waterfront. Developed by Two Trees Management, the Refinery at Domino is the second …
Learn About the 18 Tenant Protection Bills Now Before the City Council
Intro 0030-2018: Landlords Fund Temporary Housing This bill would require a property owner to deposit money in an escrow account (with the city's Department of Housing Preservation and Development (HP …
LGBTQ Community: 7 Architects who raise the pride and design flag high
In the spirit of the Pride Month, we decided to take a look at individuals from the field who are forwarding the cause of design and their community
Lendlease Chicago chief heads to New York
Ted Weldon is taking over as head of Lendlease's Chicago development business from Thomas Weeks, who is leaving to take a job with New York developer Rockefeller Group.
Life Science Redevelopment Project Announced For 43-10 23rd Street In Long Island City, Queens
Long Island City will soon be home to a new 208,000-square-foot lab and research facility at 43-10 23rd Street. The existing seven-story office building was acquired by Longfellow Real Estate Partners …
Low-Embodied-Carbon Concrete Bill Signed by New York Governor
After water, concrete is the most used material in the world and it has a devastating impact on the climate. The production of cement alone is responsible for between 7-8% of global carbon emissions, …
L train slowdown will end 3 months ahead of schedule
Work on the Hurricane Sandy-damaged Canarsie Tunnel is going so well that the MTA plans to wrap up its rehab work by April 2020, some three months ahead of schedule
LIRR Service to Grand Central Madison Starts This Week
After a month-long delay due to vent exhaust problems, Grand Central Madison will officially open this week, the Metropolitan Transportation Authority announced Tuesday. The first Long Island Rail Roa …
LIC Lab Venture secures $156M construction loan
45-18 Court Square currently comprises a 161,000 s/f, six-story office building with freight elevator configuration, a basement for equipment/storage and additional as-of right development...
Look Inside 3 Hudson Boulevard, Hudson Yards' Next Office Tower
A brand-new design has been revealed for 3 Hudson Boulevard, a long-planned tower with 1.85 million square feet of office space. Just shy of 1,000 feet tall, 3 Hudson Boulevard will top out at 56 stor …
Large-Scale Wire-Mesh Sculpture Suspends from the Ceiling of Cathédrale Restaurant in New York City
Dubbed Fillmore, the installation takes inspiration from the historic architecture of the legendary Fillmore East concert hall
Luxury Rental Buildings Will House Homeless Under New City Rule
The de Blasio administration is turning to luxury buildings in its search to find homes for the city's staggering homeless population. 
13 Results